White paper

Variant Minimizing Designs

camLine_Whitepaper_Minimizing_202510_Internal

The cost for the runs of a design is dominated by a subset of factors. As an example, 7 factors are considered with 4 factors which account for the costs / efforts. Typical situations are factors which need to be made by prototype manufacturing whereas the other factors are different settings the hardware variants are used in.

Download White Paper